Project Name: Goodman Tingalpa 85kW Solar System (QLD)
Site Address: Unit 1a, 60 Enterprise Rd, Tingalpa Qld 4173
Onsite Program: 1 Week  >> Completion October 2023
System Size (kW): 85kW  Solar System
Solar Panel: (Qty. 168)  Longi Solar LR5-66HPH-505M (505watt)
Inverter: (Qty. 1)    Sungrow Inverter  SG110CX
Energy Production 146,385 kWh / 85kW Solar System per year
Savings (ROI):
(Return on Investment):
$29,277 / year (per 85kW Solar System)
CO2 reduction 120,035 kg CO2/year
Design Notes:
The Tingalpa installation required careful consideration of available space for optimal panel placement and system configuration. The team faced challenges in maximizing the system’s efficiency within the facility’s layout but successfully delivered a high-quality solution with minimal impact on daily operations.
Customer review:

We couldn’t be more satisfied with the 85kW solar system installed at our Tingalpa site. The team was proactive and solution-oriented, adapting quickly to the specifics of our facility. Their commitment to quality and precision was evident in every step, and they were always available to address our questions.

We’re excited about the positive impact this system will have on our sustainability efforts and energy savings, and we look forward to working with them again in the future..

[Brendan Rowan – Riverside Electrical]